John Wray Range Cooker  ensures your aga cooker is relocated safely and efficiently. Our process includes:

  • Assessment and Preparation: Site check for suitability, power source confirmation, and flue positioning.
  • Pre-Move Steps: Turn off and cool down the aga, empty and clean, and disconnect power.
  • Secure for Transport: Depending on the model, dismantle or move the aga in one piece on a purpose-made pallet.
  • Transportation: Move slowly and carefully, load onto an equipped van for home relocation.
  • Reinstallation: Reconnect power, commission, and test by a qualified engineer.
  • Refurbishment and Upgrades: Option to refurbish or upgrade the aga during relocation. Professional assistance is crucial. Contact us for details.
aga repair
aga repair
aga repair